• Pre-fabrication and installation of
all the pipes.
• Pre-fabrication and installation of
steel pipe support for all piping.
• Pre-fabrication and installation of
the insulation and cladding of the heavy
fuel oil piping.
• Installation of utility piping of the
glass melting furnace.
• Installation of the equipment.
• Supply and execution of the pipe
painting.
• Material supply.
10th Of Ramadan City – Egypt
(1997-1998)
|